Saturday, February 19, 2011

February 18th, 2011 - Work on the Floor

Tonight I added plywood reinforcement to the keel stringer. I cut them to size and Gorilla glued them to the stringer. Then I clamped them in place and screwed through the two sides to really squeeze them together. This afternoon I cut floor pieces to fit and installed them and fastened them down tonight as well. Glassing is the next step on the floor. Then I ran some wiring for my continuous power from the back of the boat to the front as well as wired the bilge pump.
Front section of stringer

Back section of stringer

Back section of stringer with the rear floor in place

Bilge pump

Full floor view

No comments:

Post a Comment