Sunday, March 20, 2011

March 20th, 2011 - More Fiberglass

I added a battery hold down platform to the rear of the boat today. After that, I built a wall on the port side in the back of the boat to be used as a storage area next to the fuel cans. Then I started working on the front, specifically the ski storage locker. The walls were rotting away, so I cut them down to get square edges, cut plywood pieces to fit, and glued them in. After all of the glue set, I glassed the battery platform, the wall and the walls by the ski locker.

 Battery Platform

Back Wall

Back Wall Glassed

 Battery Platform Glassed
 
 Ski Locker

The stern

No comments:

Post a Comment